Current Research
Engine Line Value Stream Mapping and Layout Optimization
Principal investigator:
Graduate student(s):
Ala Qattawi
Sponsor(s):
BMW Manufacturing
Brief abstract:
This project aims at optimizing the current engine assembly line layout and processes. A value stream mapping analyses are conducted to characterize the processes sequence, value added, and resource allocation.
Impact:
This project led to better resource management under different demand (volume and mix) scenarios
Such study improves the overall engine line productivity.
Project schedule:
Initiated in 2008 and completed in 2010
Preliminary results:
Resulted in reduction of required resources in terms of space, labor and time.Resulted in a smooth takt time under different demand scenarios.
Better management of off-line resources and support.
